IOOC Installs 152-Ton Topside Offshore Platform at Forouzan Oilfield
TEHRAN – The Iranian Offshore Oil Company (IOOC) has installed the QB Topside of Forouzan offshore oil field weighing 152 tons on the QA floor of this platform.
According to IOOC, the operation was successfully carried out on Monday (August 9); earlier in mid-July, the 160-ton QA topside was located on the Cellar and Main floors.
Thus, with the completion of these two operations and the planning of the roof and heli floors on the complex, construction of the FYA platform with a total weight of 1,300 tons will be completed by late September.
Completion of the construction and installation of the FYA residential platform with a capacity to accommodate 70 people will help solve the problem of housing the operational staff of the Forouzan joint oil field.