kayhan.ir

News ID: 99695
Publish Date : 05 February 2022 - 21:31

NIGC Localizes Turbocharger Control System

TEHRAN -- The CEO of Iranian Gas Transmission Company Mehdi Jamshidi-Dana ha said that the project of localization of turbo compressor control system (NP) of Petaveh gas pressure boosting complex was put into operation.
Jamshidi-Dana said, “Experts in instrumentation and overhaul of District 2 of gas transmission operations, by relying on their scientific ability and self-confidence, created an advanced and fully localized control system based on the needs of turboshaft-type gas turbines.”
He added: “Turbo-compressor control system (NP) is a rich and valuable version of complete internal and advanced software that has been developed with the help of precision instrument experts in District 2.”